Wednesday, March 23, 2016

Empennage

Horiz Stab (1.5 hrs)

Step 2 Sect 8-12:  Continued riveting along Rib flanges at inner sub-assembly...up to the Stringers as specified in instructions.    This area is kinda challenging since reaching with bucking bar is mostly blind; or by feel....since space and sightline is constrained by Stringers.