Tuesday, April 12, 2016

Empennage

Elevator ( 3 hrs )

Step 5 at Sect 9-09:   Dimple #40 holes (3/32") on Counterbalance Skins.    Requires using Modified male Dimple die to avoid overlapping TE bend (reduced outer diameter at surface or face).   Completed Top & Bottom LH Elevator Skins.  Next doing same for RH Elevator skins.   Getting close to time to Prime then begin final assembly (yeah !)