Wednesday, April 13, 2016

Empennage

Elevator  ( 4 hrs )

Completed Step 7 for RH top and bottom Skins and Step 8,  Countersink TE Wedges.  These countersinks required a few clicks (thousandths) on microstop to allow dimples in Skins to fully seat on TE.
1st countersink on  TE showing depth (used scrap piece prior to set depth).
Scrap alum sheet holds wedge level.  Angle in back insures positioning.


Step 1-3 @ Sect 9-10:  Dimpled Left Inboard Shear Clip only (1 of 3)...glad I labeled these during disassembly.   And dimpled Inboard Tip Ribs, and all Ribs.




I mounted Main Squeeze tool to workbench, as I'd seen in another builder's posting.   It was MUCH easier to hold a part while positioning into hole and squeezing - vs clamping a part and holding the Squeezer.   Don't recall the builder, but sure glad I discovered this arrangement !











Jumped to Sect 9-11, Steps 1-4:  Additional  #40 holes to dimple:  LH & RH Root Ribs, Trim Access Reinforcement Doublers and Brace.

This required using #6 screw dimple dies in the #27 holes for the Nutplates.   I used a K1100-06 Nutplate to confirm large dimple fit correctly.

Completed LH & RH Spars - lots of holes !    Also dimpled the #40 holes in all 7 K1100-06 Nutplates, from Sect 9-12, Step 2...working ahead a little.