Friday, April 22, 2016

Empennage

Elevator  (3.5 hrs )

Sect 9-16, Step 3:  Deburred edges, Final Drilled (reamed) then deburred  all #30 holes on 4 E910 Hinge Reinforcement Plates.  Primed these prior to riveting to L & R Front Spars.  Added 4 K1000-6 nutplates that will anchor swivel bolts acting as hinges between Elevator and Horiz Stab. Instructions spec'd 470 4-6,  but first one had to be replaced after it curled as I began to squeeze.  Closer examine with gauge showed too long !   Checked alternate  -5 rivets, but gauge showed too short.  So I simply hand ground eight 470  4-6  rivets by just .5 to  -5.5 lengths.  These were perfect.
Front Spars w/  Hinge Reinforcement Plates and nutplates.

Jumped to Sect 9-17, Step 3 to rivet Shear Clips and Gussets to LH and RH Rear Spars, and cleco'd 12 Ribs ...to complete next session.  Gotta go mow since grass is growing like crazy this spring.