Sunday, May 1, 2016

Empennage

Elevator  ( 2 hrs )

Sect 9-22 Steps 6-8:  Rh Elevator Outboard close out done.  Several different lengths of rivets kept me checking instructions frequently.    Two rivets are reached via lifting open the Skin and inserting the bucking bar inside.  

I found easiest to do with Elevator set as shown in picture below... instead of from bottom and top simultaneously.  

Finally got to squeeze in all the rivets along Front Spar on top and bottom.   Tomorrow I'll do the LH Close out.  Soon...bonding in Ribs and TE.