Elevator (2 hrs )
continued Sect 9-24 with Step 6-9 (after Priming cover and C Channel supports) for Pitch Trim Servo Assembly. No "slop" in clevis pin to pushrod...a good fit.
Step 4 included Labels onto Trim Harness at each end, and trimming corners of Molex connector so fits through the bulkhead bushing. Also applied silicone to seal end of Molex connector.