Empennage

Aft Fuselage (5 hrs )

Switched to LH fuse side skin - riveted all the flat side area.  Nancy joined me in afternoon to finish mid-section with the harder to reach rivets.  Sweet!  Also riveted the alternate sizes (e.g. at tail the 426  4-4 rivets) where I found I could reach with the Main Squeeze tool.   Ready now for lower curved portions on each side.