Sunday, July 3, 2016

Empennage

Aft Fuselage ( 5 hrs )

Riveted Rudder Guides into Side Skins w/ specified blind rivets (thin washers critical to withstand loading against nylon blocks).
Inside view after blind rivets
Installed Static Lines - replaced Van's provided with Cleaveland's Upgrade Kit .  Bonded in the 2 Static Source Ports using J-B Weld epoxy (needs to cure 4-6  hrs, w/ full strength in 15 hrs) after cleaning surfaces with acetone.
Outside view of Port (one each side)
Routed tubing using 4" tie wraps - loose to later attach fittings to Ports, etc.  Moved on to Sect 10-23: Installed UAT Antenna Cable.   Sect 10-24: Installed ELT Antenna Cable,   Finished details in Sect 10-25 (prior routing done prior Skins added LH side) for Aft Fuselage Harness.  And finished details in Sect 10-26 for "Phone" Cable.

I will be calling Van's tech support to determine why wires C1036 and C1037 are each about 6 inches short of bulkhead F01406B.  Can't see how I've misrouted, etc.  Everything else fits A-OK and is neatly tie wrapped at designated locations, protecting from rubbing on edges, etc.