Saturday, September 10, 2016

Empennage

Empennage Fairings (2 hrs)

Sand, sand sand...   Rudder - Tip & Bottom (at strobe transition only),  LH & RH Elev on bottom sides,  and Vertical Stab Tip at new fiberglass end plate.
Vert Stab Tip with chamfer 
added to inset endplate
 



Rudder bottom 

Right side of Rudder Top

Left side of Rudder Top