Thursday, April 6, 2017

Wings

LH Landing Light Lens ( 2 hrs )

Finished LH Lens.  Left a greater margin at perimeter, approx 1/2" instead of 1/4".  Fits great.  Sanded edges to smooth finish using 400 grit, including rounding.  Very surprised as I was finishing up to see 2 very small cracks starting at edge - so quickly stop drilled and chamfered.  I had noticed the Backing Plates had moderate "bow" (whereas those on RH Lens sat flat onto Lens), so maybe once tightened they may have induced stress along edges.  RATS !   Hoping stop drilling will prevent major cracks from developing - or I'll have a "do over" in future.    Otherwise, I'm "done" with Wings.  Ta Dah !    Time to exchange the QB Fuselage from basement with Wings.
I left the tape on as I installed this time.  Removed tape after removing Lens.

@#$%&!  ( i.e. Drat ! )   Couple cracks started soon after I
re-inserted screws to hold backing plates while double sided tape "set".
Maybe stop drilling will save the Lens