Saturday, April 15, 2017

Fuselage

Gear Leg Openings ( 2 hrs )

Cut out and smoothed Gear Leg Openings in bottom of Fuselage: Step 3, 7-9 at Sec 26-10 for Tri Gear builder.  Nancy helped rotate the Fuselage onto a side so this was much easier !  Took some time since I first rough cut opening,  leaving material to hand file down to final size (aligned with inside panel already open - serves as template)
 

11/16" hole is for brake line routing along
gear leg