Wednesday, April 26, 2017

Fuselage

Air Vent Assembly  ( 5 hrs )

Building LH & RH Air Vent Assemblies per Sect 29-21 at Steps 1-11,  and Sect 29 -22 at Steps 1-4.  Ready to prime/paint.  Then install with adhesive.  Using upgraded (optional) SV-10 aluminum Vents replacing original black plastic Vents.  These close tightly so no cold air leakage, plus "way cool" appearance.   Lot's of trimming of molded plastic and corner of Vents.