Monday, May 1, 2017

Fuselage

Fuel Line Brackets ( 1 hr )

Jumped to Sec 31-02 since Fuselage is on its side, so easier access for some steps.   Step 1-3 for blind riveting fuel line brackets - LH side completed.   Needed to pay close attention, since some need washers, some w/o due to orientation of part & tool access.  Used wedge tool ( ref Sec 5.4) for tight clearance.   Four on LH side done, doing RH side tomorrow.  

Note:  Vans clarified in email response the Bearing Block Template is actually connected to Brake Pedal C Channels - just need to find and separate.   Since I'd jumped into Sect 33 at midpoint to install UHMW plastic bearings,  I missed two pages earlier at Sec 33-02 where this was identified.   Oops !   But I now have the template...  So I take it back - Vans is only 1 for 3 templates missing.