Fuselage

Bulkheads installed ( 4 hrs )

Completed Step 4 at Sect 30-02 adding 22 nutplates to 3 Bulkheads.  Installed Bulkheads per Sect 30-04 Steps 1-5.  Everything aligned with minimal effort so satisfying to add clecos.  Even the radiused lower corners of the Forward Fuse pulled in to align with floor Ribs.   I can see many rivets are gonna be challenging to reach and use rivet gun/bucking bar.
nutplates added.  Had to be creative to access those
close to the curved flange, but got 'em done.