Wednesday, June 7, 2017

Fuselage

Baggage Side Covers  ( 3 hrs )

Deburred edges and holes, dimpled as needed Baggage Side Covers.   After priming, riveted LH side panels to Fuse.  Cleco'd RH side, ready to rivet next work session.   Note:  top of each panel is supposed to be underneath Fuse Side Ribs, but I installed over - fits OK, and much better/smoother appearance.
trial fit
partially riveted.   Flush rivets at Aft Bulkhead.  Blind everywhere else

LH Side done.   Prefer Side Panel "over" Fuse Side Ribs