Saturday, September 2, 2017

Finish Kit

Canopy Frame ( 3 hrs )

Finished 1/8" drilling on canopy Close Out Panel.   Started Sect 38-11.  Separated RH & LH Canopy Rail Angles via bandsaw, then ground edges smooth.  Fluted (heaviest pieces fluted so far !) LH side. Stopped to go enjoy a beautiful afternoon with mild weather suitable for long ride on my Harley.
done drilling 1/8" (copper clecos) and 3/32" holes (silver clecos).

LH fluted, cleco'd to rail.  RH not done yet.