Canopy Rail Ass'ly  ( 4 hrs )

Drilled L & R Side Skins, and Canopy Handles Steps 2- 6 Sect 38-13.  Added Rail Assemblies to Canopy Steps 7-11.  Lots of layers with overlaps - very satisfying to "slide" into position.    Fitting Shims C01411 on each side was a tight fit, but ultimately aligned well. So far, so good with only 0.1 degree twist - if any.

Side Skins
 

Rail Assemblies cleco'd:  note 3 channels
as fixtures insuring correct "spread"
 

Shim added to insure gap for Canopy