Thursday, October 5, 2017

Finish Kit

Aft Canopy Frame Assembly ( 4 hrs )

Completed Steps 4-8, Sect 38-14 building Aft Canopy Frame Ass'ly.  Match drilled, deburred, Primed frames, then riveted Handle Ass'ly.   The C-01442C Aft Canopy Fixture is key to insuring alignment.  Pleased with perfectly flat when done, and fits Retention Pins on Roll Bar.
after match drilling

fixture holds alignment

trial fit aligned with Roll Bar and Retention Pins
 (prior match drilling)
after this pic, again checked alignment with Roll Bar
and Retention Pins...seems A-OK !