Friday, October 20, 2017

Finish Kit

Canopy Trim to Fit ( 4 hrs )

At Sect 38-21, Steps 8 & 9 marked then chamfered edge of Canopy along 3 inches at "point Oscar" in detail drawing.  Then used fabricated 0.040" thick feeler gauge to locate additional areas along edge to trim/chamfer per Steps 1-4 at Sect 38-22.   Many iterations of mounting Canopy on Frame, then marking again, and filing/sanding some more.  Each time Nancy helped lift Canopy into position.  Eventually achieved good fit along entire front edge and skin.
rotary drum sander works really well for initial passes