Friday, November 3, 2017

Finish Kit

Canopy Clips, Hinge Covers  ( 4 hrs )

"Tightened" Canopy screws in Zone 2 (along sides) per Sect 38-27, Step 16.   Installed Canopy Clips at 5 locations along front edge ( minimum of 3 may have been sufficient ) per Steps 1-8 Sect 38-28.   Filling the recesses in edge of Canopy for each clip was time consuming.   Finished Hinge Cover Assemblies per Steps 7-15 Sect 38-35.   Little jewels - turned out well w/ double bends in ends forming spring retainers.  [ Note: These are semi-permanent once installed and are meant to easily "give-way" if I ever release the Canopy in flight.   I researched VAF for other builders ideas on how to make them removable for service (to improve access to back side of instruments, etc).  I sent email to one builder who back in March indicated he was considering some alternatives.  For now, I proceeded once I realized they also include foam seal right where I could otherwise devise a pin release, etc.]

ready to start fiberglassing (between black tape)


size 2 rivets are tiny !
formed curved spring retainer at front