Tuesday, November 21, 2017

Finish Kit

Canopy Fairing ( 4 hrs )

After celebrating an early Thanksgiving with family -- back to Canopy Fairing sanding.  Applied microballoon & epoxy resin into pinholes and low area using squeegee to spread thin so minimal sanding.  While curing, built two extra Hinge Covers per 38-35 Steps 7- 15.  Added thicker slurry resin & microballoons to fill Hinge Seal voids per 38-36, Steps 1 - 3.  Installed ES00306 Micro Switch for Canopy Unlocked warning per 38-32, Step 1.  Installed Rear Seal along rear edge per Step 1 at Sect 38-33.
Additional Hinge Covers.  See Nov 3 posting
for build process of 1st pair