Monday, December 11, 2017

Finish Kit

Engine Mount ( 3 hrs )

Per Sect 38 - 37, Steps 2-7, and Sect 38, Steps 1-8 installed Guide Plates on Fuselage Rail.  Used silly putty instead of modeling clay - worked fine for Step 3.  Templates are helpful for alignment, too.   Per Sect 40 "Tricycle Landing Gear and Engine Mount", first reamed 6 holes in firewall with 3/8" reamer, then installed Engine Mount.  Three different bolt lengths used...and I re-checked length of top 2 since seemed fewer exposed threads than expected - especially vs the other 4.  All the bolts met length specs.    I'm confirming A-OK with Van's prior to torquing.
silly putty instead of modeling clay worked fine
 

ta dah...  guide plates ready