Tuesday, December 26, 2017

Finish Kit

Nose Wheel Installed ( 5 hrs )

Installed Nose Fork and Nose Wheel/Tire assembly per Sect 40A-07 Steps 1-7.  Used engine hoist to lift fuselage higher to get supports underneath so clearance for mounting fork.   Tightened large 1 3/4" nut on Spindle , compressing belleville washers  - until met side pull of 26 lb specified.  Glad I purchased socket recently at $13, so didn't mess up nut with channel locks, etc).   Didn't need a breaker bar or long handle, since actual torque was moderate.   I did need to drill new #30 size holes at 90 deg to original for cotter pin to get the right position.  As the belleville washers are compressed by the nut, rotating the nut just a few degrees made a large difference in side pull.    Next, installed Matco wheel and axle - and torqued through bolt (this set up avoids Van's version with compromise between tight and too tight for tapered roller bearing).  Then attached Main Gear Leg Axles per Step 1 at Sect 40A-08.  The Brake Torque Plate was confusing to correctly identify correct 4 of 8 holes, but got it done too.  Next:  check toe-in or toe-out...maybe ready to mount Main tires.
full turn against stops


tah dah !
 

adapters: 3/8 to 1/2  &  1/2 to 3/4
Main Gear Axle with Brake Torque Plate


Old tennis ball protects ankles and legs until wheels installed