Saturday, May 26, 2018

Finish Kit

Bottom Cowl ( 4 hrs )

Mounted  Bottom Cowl in final position w/o Top Cowl per Steps 13-16 at Sect 45-11.  Clamped vertical hinges then match drilled 19x per side per Steps 1-5 in Sect 45-12.  Checked fit with Top Cowl after 1st holes/cleco - remained A-OK, so proceeded.  Positioned horiz lower hinges,  marked and drilled 31x each side.   Looking great.
vertical hinge drilled for LH side Bottom Cowl
inside view...cleco


horiz hinge lower section clamped, holes marked

checking positioning of Cowl Pins...option I purchased


pleased with fit !