Inlet Ramps bonded into Top Cowl ( 4 hrs )

Used dremel to trim RH and LH Inlet Ramps to fit Top Cowl per Step 2, Sect 45-19.  Lots of iterations - and lots of dust - to get good fit all around.  Prepped for bonding, mixed batch of epoxy & cotton flox, then installed per Sect 45-20 Steps 1-4.  Re-installed Top Cowl using all the hinge pins to insure cowl maintained shape and alignment. (worked ahead couple steps, pre-shaping edges for Baffle Seal contact,  so I could use excess flox to start smoothing transitions)
clecos installed once final trimming done
bonded and first layer transition layer applied 


checking out surfaces via RH side air intake

LH Inlet Ramp clears Prop Gov control.  Later, a 1" thick
foam seal is applied to stop airflow where not wanted