Monday, June 18, 2018

Finish Kit

Oil Door completion ( 2 hrs )

Prepped Oil Door & hinge by priming and painting (interior side only).  Riveted Door, hinge and latch.   Riveted hinge to fiberglass.   Re-assembled pin with coil spring.   Very pleased with fit & operation.   Re-mounted Top and Bottom Cowl per Sect 45-25 to mark .050" (1.3mm) gaps to final sand between upper and lower interface, and along firewall to Cowl...to clear for paint and consistency.