Tuesday, July 3, 2018

Finish Kit and Avionics

Wheel Fairings & delivery of Instrument Panel ( 3 hrs )

Cont'd assembly of Wheel Fairings per Sect 46A-03 Steps 1-5 for RH side.  Will repeat for LH side before continuing with remaining steps.   Received from Stein Air the crate with all instrumentation and Panel.  Really well packed.  Looks great !  Yay....Christmas in July!
Add caption

top is laser etched with my Panel design