Monday, July 23, 2018

Finish Kit

Front Wheel Fairing  ( 1 hr )

Marked, then cut opening at top of  front wheel fairing per Steps 1 & 2 at Sect 46A-12.  Since Nose Gear has a gusset at the transition to vertical, required more trimming than instructions - to allow for full turn left and right ( perhaps this gusset was a later addition to Gear Leg vs original design?).