Monday, July 30, 2018

Finish Kit

Front Wheel Fairing ( 2 hrs )

Per 46A-14, Steps 1-7 -  final drilled #27 holes in forward shell attach holes.  Riveted 8 nutplates onto aft shell.   Fit piece of fiberglass scrap to top center of aft shell.  Bonded on with epoxy instead of two rivets per Vans instructions.
"scrap" piece from forward shell bonded to
complete the opening for the Gear Leg. 
(white paper was the template created)