Finish Kit

Gear Leg Fairings ( 4 hrs )

Machine C'sunk for 2 lower screws retaining Nose Gear Leg Fairing.  Achieved 1/8" clearance to Wheel Fairing after several iterations to mark-trim-remount ...& repeat.  (aaargghhhh...just cautious to not trim to much).   Per 46A-18, lifted wheel off ground via engine so "steered" nose wheel full left and right.  So.... needed more clearance in 2 locations per side...so repeated...again.   Finally!  Started Main Wheel Leg Fairings Steps 1-5 at 46A-19.  Essentially same process as Nose Gear Leg Fairing.  Trimmed inner and outer ends after drill & cleco T.E.  Cut hinges to 25".
upper retention via bolt

checking 1/8" clearance...some more trimming needed

close up...not quite done trimming for clearance

steering hard right...more clearance needed.

trimming ends of main wheel leg fairings

about size of my R/C airplane wings !