Monday, September 17, 2018

Avionics

GAD27 and GPS20A installed ( 3 hrs )

Measured GAD27 (already connected to IP harness by Stein Air, so didn't remove) to make a template, then  drilled four #10 holes for 10-32 pan heads on LH subpanel.  Installed 4 nutplates.  Positioned GPS20A and drilled 4 #10 holes.  Installing top 2 nutplates for GAD27 was very difficult, so I changed to blind rivets.
Nutplates installed for GAD27, GPS20A positioned (holes drilled).