Saturday, April 20, 2019

Firewall Forward Kit

Exhaust Installation ( 2 hrs )

Continued Exhaust install per 48-02.  Added Hangar Links.  Adjusted angle of Hangar Angles to 123.5 deg using provided template.   Step 4 required disconnection of Nose Gear Link (ref Sect 40A-06). to install Tailpipe.  Fortunately, another builder documented this - Vans doesn't describe.  I tried w/o doing 1st, but seemed impossible otherwise.  Used engine hoist to release load on nose wheel.  Tailpipe installed and gear re-assembled.  Ready to add remaining exhaust tubes, but trying to do as much as practical prior to opening engine to air/moisture - since 1st start is likely few weeks away.
removed bolt holding nose gear link...with engine hoist
lifting load entirely off nose wheel

tah dah ! 
Tailpipe installed on hangars in central tunnel

re-attached support link to Nose Gear. 
Ready to add exhaust tubes forward