Steevo's RV14a Build Log
Friday, May 10, 2019
Engine
Heat Muffs ( 3 hrs )
Installed Heat Muff assemblies per Sect 48-04, Steps 1-6. Added couple of the SCAT 2" hoses per 48-05.
1 of 2 heat muffs added.
Both heat muffs added, & interconnecting SCAT hose installed
hose connected for air intake
‹
›
Home
View web version