Saturday, May 11, 2019

Engine

Heat Muffs, etc ( 3 hrs )

Completed Step 6, Sect 48-05 - 2" Vent Tee.  Limited space to 1st install two Adel clamps to engine mount tubes, then very large Adel Clamps around 2" Vent.  Used safety wire to hold clamps in position.  Overall took a lot of time to get positioned correctly - and lots of various tools!   Glad that's done !
Using tool to hold clamp closed so I can
hold closed w/ safety wire
In the end, I used many tools to get  'er done.






close up showing clamps secured
And overall shot showing 2" SCAT hose routing