Steevo's RV14a Build Log
Friday, March 11, 2016
Empennage
›
Horiz Stab (1.5) Went flying today ! My wife and I targeted this date as best weather for the week ....62 deg F, and light wind with lot...
Thursday, March 10, 2016
Empennage
›
Horiz Stab (2.0 hrs) Continued deburring per Sec 8-6. Lots of edges ! Began to work ahead on Step 4: fabricate 4 cradles. Using 1/2 ...
Wednesday, March 9, 2016
Empennage
›
Horiz Stab (4.5 hrs) Sec 8-5 Step 1: Rivet Front Spar, Doubler, and Caps (2). Requires 5 different rivet types/sizes, so needed to f...
Tuesday, March 8, 2016
Empennage
›
Horiz Stab (3.5 hrs) Sec 8-4, steps 2 - 7: For Doubler on Front Spar, Final Drill all the #30 holes, then C.S the 12 specified holes. ...
Empennage
›
Mar 7, Mon Horiz Stab (3.5hrs) Sect 8-4: Started Front Spar build with deburring all edges, including lightening holes. Clamped Spar C...
Sunday, March 6, 2016
Empennage
›
Mar 5, 2016 Horiz Stab (4.0hrs) Sect 8-2: Steps 7-8. Clean doubler with acetone, then primed. After drying, riveted to Rear Spa...
Friday, March 4, 2016
Empennage
›
Horizontal Stab (2hrs) Steps 5-7 completed. Countersunk 2 holes that will be under center hinge brackets. Used microstop with #30 CS b...
‹
›
Home
View web version