Steevo's RV14a Build Log
Thursday, March 31, 2016
Empennage
›
Elevator (1.5 hrs) Started by reviewing (again) entire section for Elevators (29 pages). HIghlighted special instructions , unique tools...
Wednesday, March 30, 2016
Empennage
›
Horiz Stab (2 hrs) Cont'd Step 4 on Sect 8-12: Finished 3 more sides along Rear Spar. Pleased with straightness and no waviness. ...
Tuesday, March 29, 2016
Empennage
›
Horiz Stab (3.5 hrs) Sect 8-12 ( and 13 map). Riveted remaining Inspar Ribs, including ends with Nose Ribs. before finishing end rib...
Monday, March 28, 2016
Empennage
›
Horiz Stab (1.5 hrs) Sect 8-12 (& page 13 is a map of rivets lengths), Continued Step 2: Finished riveting Top side to Inspar Ribs -...
Saturday, March 26, 2016
Empennage
›
Horiz Stab (2.0 hrs) Continued riveting "up to Stringers" (ie vertical lines near center). Then riveted along Stringers (ie ho...
Wednesday, March 23, 2016
Empennage
›
Horiz Stab (1.5 hrs) Step 2 Sect 8-12: Continued riveting along Rib flanges at inner sub-assembly...up to the Stringers as specified in i...
Monday, March 21, 2016
Empennage
›
Horiz Stab (5.0 hrs) Cont'd with Sect 8-12 at Step 1: Riveting along Front Spar flanges for all four sides (R & L, Top & Bott...
‹
›