Steevo's RV14a Build Log
Tuesday, June 27, 2017
Fuselage
›
Control Sticks Aligned & Brake Lines Leak Tested ( 2 hrs ) Aligned Control Sticks to be parallel w/in 1/8" top to bottom (vs slig...
Monday, June 26, 2017
Fuselage
›
Control Stick Bases ( 2 hrs ) Primed, then finish painted 4 Rudder Cable Links and the Wiring Channel Ass'ly (goes under dash in cente...
Friday, June 23, 2017
Fuselage
›
Brake Lines ( 3 hrs ) Installed Brake Lines - Crossover and Main Brake Lines per Sect 33-08 & -09/. Prepped Cable Links for priming p...
Thursday, June 22, 2017
Fuselage
›
Rudder Pedal Assembly ( 4 hrs ) Installed 8 Brass Elbows to Brake Master Cylinders on Rudder Pedal Ass'ly ( Sect 33-04). Installed f...
Wednesday, June 21, 2017
Fuselage
›
Control Sticks & Elev Pushrods ( 5 hrs ) Completed Steps 4 - 9, Sect 36-10 for Align & Drill LH & RH Control Sticks into Base...
Tuesday, June 20, 2017
Fuselage
›
Bellcrank Assembly ( 4 hrs ) Built Bellcrank Mount and AutoPilot Pitch Servo Bracket per Sect 36-06 and -07. 1st trimmed bracket, added ...
Monday, June 19, 2017
Fuselage
›
Elevator Pushrods ( 3 hrs ) A few locations on the interior needed some re-painting. Simply sanded with 400 grit, cleaned and sprayed a c...
‹
›