Steevo's RV14a Build Log

Saturday, December 30, 2017

Finish Kit

›
Axle Shims, Wheels & Brakes installed ( 4 hrs ) Ground two 8" x 3/8" Bolts creating drift pins for Wing to Spar assembly (Se...
Friday, December 29, 2017

Finish Kit

›
Fuel Lines ( 3 hrs ) Built Left and Right Fuel Vent Lines (1/4") using new tools just rec'd from Aircraft Spruce:    Rolo-Flair F...
Wednesday, December 27, 2017

Finish Kit

›
Toe In of Main Axles  ( 3 hrs ) Per instructions Sect 40A-08,  Steps 1-3 measured Toe-In of Main Gear Axles.  Spec'd to be maximum 0.2...
Tuesday, December 26, 2017

Finish Kit

›
Nose Wheel Installed ( 5 hrs ) Installed Nose Fork and Nose Wheel/Tire assembly per Sect 40A-07 Steps 1-7.  Used engine hoist to lift fuse...
Saturday, December 23, 2017

Finish Kit

›
Nose Gear Link Assembly ( 2 hrs ) Completed Nose Gear Link Assembly per Steps 1-6 at Sect 40A-05.  Most of time required to clean up extra...
Friday, December 22, 2017

Finish Kit

›
Nose Gear Install  ( 2 hrs ) Attached Nose Gear Leg to Engine Mount per Sect 40A-05 Steps 1-4.    Prepped variety pieces  so ready to comp...
Thursday, December 21, 2017

Finish Kit

›
LH Main Gear Mount ( 3 hrs ) Installed LH Main Gear Leg per Sect 40A-04.   Experience with RH Leg helped make this one a little easier to ...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.