Steevo's RV14a Build Log
Wednesday, January 3, 2018
Finish Kit
›
Brake Lines ( 3 hrs ) Received from Van's the AN365-524 nuts to replace MS21083 N5 shear nuts on the Gear Braces per Sect 29-03 -- to...
Saturday, December 30, 2017
Finish Kit
›
Axle Shims, Wheels & Brakes installed ( 4 hrs ) Ground two 8" x 3/8" Bolts creating drift pins for Wing to Spar assembly (Se...
Friday, December 29, 2017
Finish Kit
›
Fuel Lines ( 3 hrs ) Built Left and Right Fuel Vent Lines (1/4") using new tools just rec'd from Aircraft Spruce: Rolo-Flair F...
Wednesday, December 27, 2017
Finish Kit
›
Toe In of Main Axles ( 3 hrs ) Per instructions Sect 40A-08, Steps 1-3 measured Toe-In of Main Gear Axles. Spec'd to be maximum 0.2...
Tuesday, December 26, 2017
Finish Kit
›
Nose Wheel Installed ( 5 hrs ) Installed Nose Fork and Nose Wheel/Tire assembly per Sect 40A-07 Steps 1-7. Used engine hoist to lift fuse...
Saturday, December 23, 2017
Finish Kit
›
Nose Gear Link Assembly ( 2 hrs ) Completed Nose Gear Link Assembly per Steps 1-6 at Sect 40A-05. Most of time required to clean up extra...
Friday, December 22, 2017
Finish Kit
›
Nose Gear Install ( 2 hrs ) Attached Nose Gear Leg to Engine Mount per Sect 40A-05 Steps 1-4. Prepped variety pieces so ready to comp...
‹
›
Home
View web version