Steevo's RV14a Build Log

Thursday, January 25, 2018

Avionics

›
Magnetometer installed ( 2 hrs ) Completed assembly of GMU22 Magnetometer, then installed into Left Wing.  Discovered need "CPC"...
Wednesday, January 24, 2018

Avionics

›
ELT install & Sealed Heat Vents ( 2 hrs ) Completed installation of ELT and Audio Alert.   Rec'd GMU 22 Install Kit, so added Moun...
Tuesday, January 23, 2018

Avionics

›
ELT installation  ( 3 hrs ) Started installation of ELT per Sect 53-02 ( ACK Tech  Model E-04 121.5/406 Mhz Emergency Locator Transmitter)...
Monday, January 22, 2018

Firewall Forward

›
EAA Tech Counselor Review Terry Moushon, a new EAA Tech Counselor spent several hours inspecting & discussing my build status and plan...
Saturday, January 20, 2018

Avionics

›
Auto Pilot Servo  ( 3 hrs ) Installed Garmin Auto Pilot Servo GSA 28 for roll in right Wing per Sect 56-05, Steps 1-12.  Tight & awkwa...
Friday, January 19, 2018

Firewall Forward Kit

›
Sensors installed on Firewall ( 1 hr ) Installed Garmin MAP Sensor (Step 5 at Sect 43-03) on Firewall,  and Oil Press and Fuel Press Senso...
Thursday, January 18, 2018

Firewall Forward Kit

›
Relocating Throttle/Prop/Mixture Cable Controls (3 hrs ) Trial fit the T/P/M cable template (repositions these cables at bottom of Panel, ...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.