Steevo's RV14a Build Log

Saturday, March 17, 2018

Firewall Forward Kit

›
Wiring to Starter & misc ( 3 hrs ) Routed WH-P16 Starter Wire from starter relay at firewall to Sky-Tec starter (model 149-12XLT, pre-...
Sunday, March 11, 2018

Firewall Forward Kit

›
Wingtip Wiring Rev 2, and Cushioned clamps (1 hr ) Revised black (ground) wire routing per Sect 19-02 (Rev 2 on 11/20/17) for Wingtip Ligh...
Saturday, March 10, 2018

Firewall Forward Kit

›
Dehydrator Plugs ( 1 hr ) Installed 4 Dehydrator Plugs  (18mm).  Needed trip to hardware store to get a long reach 7/8" socket for th...
Friday, March 9, 2018

Firewall Forward

›
Fuel Flow Transducer ( 1 hr ) Installed IE Dynon FF  Fuel Flow Transducer, including VA 102 Fuel Press Line and FF00019 Hose Ass'ly to...
Thursday, March 8, 2018

Firewall Forward

›
Propeller Gov ( 1 hr ) Mounted Hartzell S-1-79 Propeller Gov ( serial # G3709NJ) per Steps 3-6 at Sect 43-07.  Small adjustment to arm pos...
Tuesday, February 13, 2018

Avionics and Firewall Forward Kit

›
Magnetometer connector and Engine fittings ( 1 hr ) Inserted 9 pins for wiring harness for CPC connector for GMU22 Magnetometer per Sec...
Wednesday, January 31, 2018

Engine

›
Cotter Pins, etc ( 1 hr ) Added cotter pins to 4 castle nuts on engine mount bolts.  The one at bottom mount under LH rear cylinder is tou...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.