Thursday, April 26, 2018

Firewall Forward Kit

›
Cooler Tray installed ( 3 hrs ) Installed the Oil Cooler Tray to the Firewall and Engine Mount following Steps 3-6 at 49-08, including add...
Tuesday, April 24, 2018

Firewall Forward Kit

›
RTV at Baffles, Oil Cooler  ( 3 hrs ) Finished applying Hi-Temp RTV to baffles.  Replaced "gage port" on Fuel Spider per Steps 1...
Monday, April 23, 2018

Firewall Forward Kit

›
 RTV sealant on Baffles.  Oil Temp Sensor moved ( 3 hrs ) Applied Hi-Temp RTV at Engine to Baffle small gaps per Sect 47-24, Step 4.  Va...
Saturday, April 21, 2018

Firewall Forward Kit

›
Oil Cooler, etc ( 2 hrs ) Riveted nutplates to Oil Cooler Tray and Supports (Steps 1-2 at Sect 49-08).  Riveted Duct Flange to Oil Cooler ...
Thursday, April 19, 2018

Firewall Forward Kit

›
Breather Tube, Painted Oil Cooler Tray ( 3 hrs ) Installed Breather Tube per Steps 5-7 at 49-02.  Reaching the two AN525-10R8 screws to ti...
Wednesday, April 18, 2018

Firewall Forward Kit

›
Oil Cooler Tray, Breather tube, and Instrument Panel partially built  ( 2 hrs ) Finished prep of Oil Cooler Tray, etc - but need warmer we...
1 comment:
Saturday, April 14, 2018

Firewall Forward Kit

›
Alt Air Inlet and Oil Cooler Tray ( 3 hrs ) Match drilled six #40 holes, dimpled the 2 forward locations, then riveted Right Air Ramp Cone...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.