Steevo's RV14a Build Log
Saturday, September 8, 2018
Avionics
›
Avionics installation ( 3 hrs ) Fabricated support for GTX-45R transponder with pair of piano hinges (left over from seat back build). Us...
1 comment:
Friday, September 7, 2018
Avionics
›
Avionics mounting ( 4 hrs ) Installed LH & RH Cabin Heat Control Cables after cutting to 36" lengths per Sect 50-07. Needed to i...
Thursday, September 6, 2018
Empennage
›
Empennage Fairing ( 3 hrs ) Completed filling pinholes using epoxy/micro balloons, followed by sanding. Then re-coat with Cromax Quickpri...
Monday, September 3, 2018
Empennage
›
Empennage Fairing ( 2 hrs ) Finished sanding smooth where I filled pinholes. Sprayed Cromax Quickprime A-4240S (sandable, acrylic primer)...
Saturday, September 1, 2018
Empennage
›
Empennage Fairing ( 2 hrs ) Mixed epoxy/flox and filled pinholes on Emp Fairing (also some on 4 Instersection Fairings). Later, after cu...
Empennage
›
Empennage Fairing ( 3 hrs ) Completed sanding high spots and contoured at HS leading edge. Removed Fairing ( Yay ! - some prying require...
Thursday, August 30, 2018
Empennage
›
Empennage Fairing ( 1 hr ) Wet sanded most of Emp Fairing with 80 and 120 grit to remove waviness and high spots. Good progress, but mor...
‹
›