Steevo's RV14a Build Log

Saturday, September 15, 2018

Avionics

›
GEA 24 and Avionics Bus install ( 2 hrs ) Installed four 10-32 nutplates to sub-panel, then mounted Garmin GEA 24.  Made cardboard tem...
Thursday, September 13, 2018

Avionics

›
Installing GEA24 on sub-panel ( 2 hrs ) Drilled four #10 holes for mounting Garmin GEA24 on sub-panel.  Drilled #40 holes for nutplates fo...
Wednesday, September 12, 2018

Avionics

›
Install GTX-45R transponder ( 3 hrs ) Removed "center" area for transponder support plates.  Primed after drilling #40 holes, th...
Saturday, September 8, 2018

Avionics

›
Avionics installation ( 3 hrs ) Fabricated support for GTX-45R transponder with pair of piano hinges (left over from seat back build).  Us...
1 comment:
Friday, September 7, 2018

Avionics

›
Avionics mounting ( 4 hrs ) Installed LH & RH Cabin Heat Control Cables after cutting to 36" lengths per Sect 50-07.  Needed to i...
Thursday, September 6, 2018

Empennage

›
Empennage Fairing ( 3 hrs ) Completed filling pinholes using epoxy/micro balloons, followed by sanding.  Then re-coat with Cromax Quickpri...
Monday, September 3, 2018

Empennage

›
Empennage Fairing ( 2 hrs ) Finished sanding smooth where I filled pinholes.  Sprayed Cromax Quickprime A-4240S (sandable, acrylic primer)...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.