Steevo's RV14a Build Log
Thursday, November 15, 2018
Avionics
›
Ignition Wire Routing ( 2 hrs ) Routed ignition wires from Mag and PMag to plugs, along with thermocouple wires for CHT and EGT sensors. ...
Wednesday, November 14, 2018
Avionics
›
Complete installation P909, ANL Fuse Limiter, Shunt & P912 ( 2 hrs ) Torqued terminal bolts and applied torq seal. Added cushion clam...
Tuesday, November 13, 2018
Avionics
›
Shunt and ANL Fuse Limiter ( 4 hrs ) Mocked up installation design of ANL Fuse Limiter Block w/ 60 amp Fuse and Shunt for mounting inside...
Saturday, November 10, 2018
Avionics
›
Mags wired to Ignition Switch & P909 Alternator Power Wire ( 3 hrs) Attached Right, Left and Gnd wires for Mag and PMAG to Ignition Sw...
Friday, November 9, 2018
Avionics
›
J243 Connector and Mag Wiring ( 4 hrs ) Connected J243 to Garmin GEA24 on RH sub-panel after splitting "Tach Sensor Mag" (connec...
Thursday, November 8, 2018
Avionics
›
Ground Plate and GEA24 J242 ( 3 hrs ) Torqued 5/16" bolts (one brass, other SS) attaching ground plate/"forest of tabs" to ...
Saturday, November 3, 2018
Avionics
›
Forest of Tabs ( 2 hrs) Crimped 13 blue (14-16 ga) Faston terminals onto 25 black ground wires: (2) 18ga wires at each terminal, (20) 22 ...
‹
›
Home
View web version