Steevo's RV14a Build Log

Friday, November 30, 2018

Avionics

›
P Mag connection ( 4 hrs ) While preparing to connect "P-Lead R" to right Mag, discovered statement in E-Mag install guide to se...
Thursday, November 29, 2018

Avionics

›
Wiring to Fuel Flow Transducer ( 2 hrs ) Connected "red cube" Fuel Flow Transducer (Electronics International FT-60) to wires fr...
Tuesday, November 27, 2018

Avionics

›
Mag P-Lead, Oil Temp, Fuel Pressure, Oil Press sensors connected ( 3 hrs ) Completed installation of P-Lead and gnd wire to LH Mag.  Conne...
Monday, November 26, 2018

Avionics

›
Mag P-Lead, etc ( 3 hrs ) Attached two -12 size cushion clamps to engine mount near LH firewall and Left Mag to route wires for Fuel and O...
Saturday, November 24, 2018

Avionics

›
Alt Field, Discrete #4 and Contactor Relay" connected ( 3 hrs ) Connected "Alt Fld" wire (from Master Switch position 3) to...
Tuesday, November 20, 2018

Avionics

›
Ignition Wiring (  3 hrs ) Received re-done Floormats and Baggage Floor from Abby at Flightline Interiors.  Much improved fit -- Yay!  [ N...
Monday, November 19, 2018

Avionics

›
CHT sensors LH side ( 2 hrs ) Completed LH side CHT sensors for cyl 2 & 4.   Torqued all four to 28 in-lbs per Alcor Tempest instructi...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.