Steevo's RV14a Build Log
Monday, December 3, 2018
Avionics
›
EarthX battery warning via GAD27 ( 2 hrs ) Will soon be installing EarthX battery, model EXT680 . This LiFePO4 battery includes a BMS (ba...
Saturday, December 1, 2018
Avionics
›
EAA Technical Counselor Inspection Terry Moushon, EAA Tech Counselor visited Sat am, Dec 1 to inspect build quality ( his last inspection ...
Friday, November 30, 2018
Avionics
›
P Mag connection ( 4 hrs ) While preparing to connect "P-Lead R" to right Mag, discovered statement in E-Mag install guide to se...
Thursday, November 29, 2018
Avionics
›
Wiring to Fuel Flow Transducer ( 2 hrs ) Connected "red cube" Fuel Flow Transducer (Electronics International FT-60) to wires fr...
Tuesday, November 27, 2018
Avionics
›
Mag P-Lead, Oil Temp, Fuel Pressure, Oil Press sensors connected ( 3 hrs ) Completed installation of P-Lead and gnd wire to LH Mag. Conne...
Monday, November 26, 2018
Avionics
›
Mag P-Lead, etc ( 3 hrs ) Attached two -12 size cushion clamps to engine mount near LH firewall and Left Mag to route wires for Fuel and O...
Saturday, November 24, 2018
Avionics
›
Alt Field, Discrete #4 and Contactor Relay" connected ( 3 hrs ) Connected "Alt Fld" wire (from Master Switch position 3) to...
‹
›
Home
View web version