Steevo's RV14a Build Log

Thursday, June 27, 2019

Finish Kit (and others for Final Assembly)

›
Magnetometer Interference and Joystick re-position ( 5 hrs ) Repeated full Magnetometer Interference test.  Again, Pitot Heat wa...
Wednesday, June 26, 2019

Finish Kit (and others for Final Assembly)

›
ADAHARS and Magnetometer Calibrations ( 7 hrs ) Performed ADAHARS (Garmin installation manual 35.4.7) and Magnetometer GMU 22 Calibrations...
Tuesday, June 25, 2019

Finish Kit (and other categories for Final Assembly)

›
Fuel Flow test for Pitch Up attitude ( 4 hrs ) Completed RH Tank calibration of fuel levels -  see June 24 entry.  Then I raised nose unti...
Monday, June 24, 2019

Finish Kit (and others for Final Assembly)

›
Flow test from LH Fuel Tank, Calibrate Fuel Senders ( 4 hrs ) Continued testing Fuel Flow rates for LH Tank, repeating process used for RH...
Saturday, June 22, 2019

Finish Kit (and others...for Final Assembly)

›
Fuel Flow testing ( 3 hrs ) Set up to test fuel flow rates with Aux Boost Pump, including determining Unusable Fuel in tank, and to flush ...
Friday, June 21, 2019

Finish Kit (and others for Final Assembly)

›
Pitot/Static Leak test and ADAHARS calibration ( 4 hrs ) Fixed 1 tube connection in Aft Fuse at T connector from LH Static Port.  Required...
Thursday, June 20, 2019

Finish Kit (....and others for Final Assembly)

›
Roll Trim Calibrated, Leak Test Static System ( 4 hrs ) Calibrated Aileron or Roll Trim in G3X.  Discovered I had to reverse Roll Trim Swi...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.