Elevators ( 2 hrs )
Sect 9-09, Setp 2 Attached (cleco'd) LH and RH Elevator Horns. #30 (ie 1/8" holes) drilled at twelve times each horn - but those rivets are critical !
Step 3: Final Drilled all mating part holes not already done for Elevator assembly. Then dis-assembled - but critical to mark parts for later re-assembly. (used permanent marker with tape over to protect as scuff, acetone clean and prime parts. these are in areas entirely still covered 100% Alclad, so remain corrosion protected after remove tape at re-assembly) Only got RH Elevator completely "done", so planning next session to do same for LH side.
No comments:
Post a Comment