Tuesday, August 2, 2016

Empennage

Empennage Attach (4 hrs )

Drilled opposite Elev Horn using Drill Guide Block.  Checked T.E. alignment:  close but not perfect (I jigged with straight edges to hold TE in alignment, so surprised wasn't dead on)   So I contacted Van's builder support, and discussed with Scott Risan.  He advised A-OK, within normal range.   Good news because difficult to modify now !

Sect 11-05 to Position and bolt on Horiz Stab to Aft Fuselage.  Drilled four 1/4" holes through Rear Spar of HS, and bolted on Vert Stab Bracket.    The mounting hole for V.S. is off-center slightly to left about 5 mm...as noted in instructions.  (offsets left turning from engine and prop torques.  This is a clever way to do it, and was probably easily adjusted in prototypes built to allow for revision)
drill guide block used at Elev Horn
Note off center hole for VS mounting




No comments:

Post a Comment